Rolling West Michigan apple orchards heavy with red fruit, with maple and beech woodlots in early autumn colour on the ridge beyond.
Ottawa County, Michigan Grand Rapids & West Michigan

Barndominium Builders in Holland, Michigan

Holland is in Ottawa County, with its southern part reaching into Allegan County, and the city itself is mostly settled neighbourhoods, downtown blocks and industry around Lake Macatawa. Open acreage inside the limits is scarce. On a larger residential lot, though, a modest barndominium with an attached garage-shop can be designed to the Unified Development Ordinance and look at home on the block. For a few acres, a separate pole barn or a wide equipment bay, most of our Holland-area clients buy in the surrounding townships of Ottawa County or Allegan County, where the township zones the land and a county health department handles the well and septic. We can supply barndominium kits to an owner-builder, draw a custom plan around a tight city lot, frame a pole barn home on rural ground, or run a turnkey build from site work to finish. City permits and zoning both run through Community and Neighborhood Services at City Hall, and the Board of Public Works handles sewer hook-ups. Share the address or parcel through the survey so we can confirm the zone district and sewer access early.

Holland at a glance

Principal county
Ottawa County
Building permit
City building department
Zoning
City zoning
Wastewater
Public sewer in town

Pole Barn Homes near Holland

A pole barn home sets its frame on posts and trusses (the engineering term is post-frame), which often suits a simple, wide layout with a shop bay under the same roof. Whether it fits your parcel comes down to the zoning and the site, set out below.

Permits, Zoning and Septic in Holland

Four offices usually decide whether a barndominium can go on a given parcel. Here is who they are in Holland, taken from the office or document that publishes each rule. Rules change, so check them again against your parcel before anything is drawn.

Who issues the building permit City building department

City of Holland Community and Neighborhood Services

A new one- or two-family house needs the city's building application plus its plan review list and sealed-plan submission requirements, sent to Community and Neighborhood Services at City Hall. The city says plan review takes two to four weeks, and building, electrical, mechanical and plumbing permits are issued separately.

Source: Building Permit Requirements, City of Holland (cityofholland.com)

Who decides the zoning City zoning

City of Holland Community and Neighborhood Services (Zoning)

Holland zones its land through a Unified Development Ordinance with a zoning map and a form-based code sub-district map, both published by Community and Neighborhood Services. The Board of Appeals is the only body that can grant variances from the ordinance, so a design that breaks a district rule goes there.

Source: Zoning, City of Holland (cityofholland.com)

Sewer, septic and well Public sewer

Holland Board of Public Works inside the city; Ottawa or Allegan County health department beyond its sewer

The Holland Board of Public Works provides wastewater service in the City of Holland and in Fillmore and Laketown townships, and asks anyone building there to contact it before construction begins. Off the sewer, the county health department (Ottawa or Allegan) permits the septic system and the well.

Source: Wastewater, Holland Board of Public Works (hollandbpw.com)

Soil erosion permit County enforcing agency

Ottawa County Water Resources Commissioner or Allegan County Health Department (County Enforcing Agency)

Holland's stormwater manual directs builders to obtain the soil erosion and sedimentation control permit from the County Enforcing Agency before excavation. On the Ottawa side that is the Water Resources Commissioner; on the Allegan side, the county Health Department. Either permit applies to work of an acre or more or within 500 feet of water.

Source: Stormwater Standards Manual, City of Holland (cityofholland.com)

One city, two counties
Holland's Stormwater Standards Manual (February 2019) applies both the Ottawa County Standards & Specifications for Drain Commissioner's Approval and the Allegan County Drain Commissioner's Development Standards, a practice the city adopted by council resolution on 1 September 2010 (read 27 September 2026).

Source: Stormwater Standards Manual, City of Holland (cityofholland.com)

Shops and garages
The City of Holland treats accessory buildings over 200 square feet like new houses and additions: the owner completes the building application and follows the plan review list, while buildings under 200 square feet have their own shorter application (City of Holland building permit pages, read 27 September 2026).

Source: Building Permit Requirements, City of Holland (cityofholland.com)

Building on land near Holland

Inside Holland, check the zone district on the city map, the lot width, and whether the Board of Public Works sewer reaches the street. Lots near Lake Macatawa, the Macatawa River or a drain can need a soil erosion permit and stormwater review, and the city applies the county drain standards on both sides of the county line. Once the search moves into the surrounding townships, a well and septic system become likely, so the county health department's soil evaluation belongs before closing. On the Ottawa side, a home already on a well or septic system needs the county's transfer evaluation before sale.

Other places in this part of Michigan

Have land in or near Holland? Tell us about the parcel and what you want on it, and we will check it against the local rules before anything is drawn.

Building in Holland: questions

Start the survey
How much does it cost to build a barndominium in Holland?
On a city lot the site costs are the sewer and water connection, any stormwater work, and finishes that suit the district; in the townships a well, septic system and longer drive take their place. We quote against the real parcel, not a flat rate. For third-party per-square-foot figures and the factors behind them, read the barndominium cost guide.
Do I need a building permit for a barndominium in Holland?
Yes. Inside the city a barndominium used as a home follows the new one- and two-family house path through Community and Neighborhood Services, with plan review and separate electrical, mechanical and plumbing permits pulled by the licensed trade contractors doing that work. Outside the limits, the township where the land sits decides; see the Ottawa County or Allegan County page.
Is Holland in Ottawa County or Allegan County?
Both. Most of the city is in Ottawa County and its southern part is in Allegan County, which matters for soil erosion permits and, just outside the city, for which health department handles the well and septic system. The city itself handles building permits and zoning on both sides.
Where can I find acreage for a barndominium near Holland?
In the townships around the city, on either side of the county line, where lots are larger and each township sets its own zoning. Send the parcels you are weighing through the survey and we will check the zone, sewer or septic, and erosion questions for each.

Other places near Holland

Nearby places with their own pages. Across a city limit, a township line or a county line the permit office, the zoning and the septic rules can change, so each is covered separately.

Building in Holland?

Start with the survey. Tell us where the land is and what you want on it, and we will come back with which offices decide it, what the zoning allows, and a plan to fit.